Skip to content

Process industry machines & systems

Products and components for process industry machines & systems.

Process industry machines & systems products

43 products

Technology overview

Products and components for process industry machines & systems.

Quality and certification

Certified quality management, calibration certificates and calibration services at manufacturers’ facilities.

  • Every instrument is supplied with a calibration certificate.
  • Advanced calibration services at manufacturers’ facilities abroad, coordinated and supported by Elina.
  • The quality management system is certified to ISO 9001:2015. Certificate I31417 is valid until 7 April 2028.
Download the certificate PDF
9001:2015

The industries we serve

Frequently asked questions

Answers to the most common questions about our products and services

Gravimetric feeding uses weight information for feed control; volumetric feeding is based on delivered volume. Selection depends on material, accuracy requirements and process.

Provide the material, its flow behavior, required feed rate and process-integration conditions. Qlar offers standard families and application-specific configurations.

Weighing supplies weight information, feeding regulates material entering the process, and conveying transfers it between locations. Qlar offers equipment for these different functions; select each stage for its role in the line.

No. Operation follows the process requirement. For example, the standard ProPhase configuration supports batch or continuous conveying. Specify whether material is transferred in batches or as a continuous stream.

When actual material behaviour is important to feeding performance. Qlar describes bulk-material testing and test centres for matching ingredients with equipment. A representative sample supports evaluation before integration into the line.

Select electronics that monitor individual load cells. DISOBOX Plus, for example, provides access to each cell signal and supports fault identification. Compatibility with the cells and process controller must be checked during system design.

Didn't find the answer you were looking for?

Talk to an expert

More information

Contact us

Tell us what you need to measure and an engineer will get back to you.

Send us a message

Email or phone — one of them is enough

Email or phone — one of them is enough

0 of 500 words